Process

A staircase is one weekend in your life. We treat it like one.

01
Site visit & measurement

Trevor visits your home (or works from precise client measurements). We capture the opening, ceiling height, finished floor levels, and the lines of sight that matter.

02
Design & approval

You receive a CAD drawing with tread species, stringer geometry, glass detail and lighting plan. Nothing is fabricated until you sign off.

03
Shop fabrication

Treads are milled from solid 3-inch oak, walnut or ash. Stringers are welded and powder-coated. Glass is tempered to spec. Everything is dry-fit before it leaves.

04
One-day install

The kit arrives pre-finished. A typical staircase lands, levels and locks in within a single day — minimal dust, minimal downtime in your home.

05
Light & finish

Concealed LED is wired through the hollow of the stringer, the glass standoffs are tightened, and the final tread is set. We leave the site clean.

Detail of a floating staircase under construction

"Pre-fabricated isn't a shortcut. It's how you guarantee the finish." — Trevor